Bids/RFP/RFQ - Syracuse Hancock International Airport

Airport Access Heads Up
I-90, Exit 36 (Watertown/Binghamton) east and westbound ramps to Interstate 81 north will be closed to traffic beginning Monday, November 18, to Friday December 6.
Motorists are advised to follow the signed detour to I-81 south, to Exit 25 (7th North Street/Liverpool), to east on 7th North Street, to I-81 northbound.

Bids/RFP/RFQ

Active Bids, RFPs, and RFQs

Please input your email address and choose the bid document you would like to download from the dropdown menu below. You will receive an email with a download link for the desired document. As of October 2, 2023, all newly-posted bid documents will be provided via this method.

**Please note** Access to construction and other improvement related information is strictly for official use only. You may not disseminate this information on a public platform without the written authorization of the Syracuse Regional Airport Authority (SRAA).

Current Bid Opportunities Available via the Above Dropdown Menu Include

(Documents are only available via the above dropdown menu)

  • RFP #2024-23 Passenger Assistance Services
    • RFP #2024-23 Passenger Assistance Services Addendum #1
    • RFP #2024-23 Passenger Assistance Services Addendum #2
  • RFP #2024-22 SRE OH Door Expansion (Construction)
    • RFP #2024-22 SRE OH Door Expansion Addendum #1
  • RFP #2024-21 Parking Garage Repairs 2024-2025
    • RFP #2024-21 Parking Garage Repairs 2024-2025 Addendum #1
    • RFP #2024-21 Parking Garage Repairs 2024-2025 Addendum #2
  • RFP #2024-15 Fuel Farm Coatings
    • RFP #2024-15 Fuel Farm Coatings Addendum #1
  • RFP #2023-25 Security Access Control System Replacement
    • RFP #2023-25 Security Access Control System Replacement Addendum #1
    • RFP #2023-25 Security Access Control System Replacement Addendum #2
    • RFP #2023-25 Security Access Control System Replacement Addendum #3
    • RFP #2023-25 Security Access Control System Replacement Addendum #4

 

 

As a courtesy, the Syracuse Regional Airport Authority (SRAA) shares anticipated upcoming construction and other bid opportunities at Syracuse Hancock International Airport (SYR) here. Any questions regarding upcoming opportunities should be directed to Bids@syrairport.org.

  • Maintenance Campus Upgrades including new building construction and/or building refurbishments.
  • Parking lot design and construction for two locations, including a lot for approximately 800 spaces and one for 50 spaces.
  • Roof replacement for North Terminal
  • New building construction for housing a new switchgear.
  • Construction of new rental car facility (Consolidated Rental Car Facility, or “CONRAC”)
  • Repairs in parking garage

IFB #2023-17 Taxiway A Rehabilitation (West)

SRAA Passenger Boarding Bridge Replacement IFB2022-1 and 2022-2

SRAA IFB 2022-04 RFQ Comprehensive De-Icing Operations Program Conceptual Redesign and Environmental Phase 1 (Design)

SRAA IFB 2022 -10 Air Cargo Apron Concrete Hard Stand

SRAA IFB 2022 – 11 Airport Surface Parking Lot Expansion

SRAA Office Expansion IFB Reference #2021-08

TSA Office Buildout IFB Reference #2020-07

IFB #2020-05 the Airfield Equipment Cold Storage Building Advertisement

IFB #2020-04 SYR Runway 10-28 Advertisement

  • 5/18/2020: Award to Seneca Stone Corporation

IFB #2020-03 SYR Exit Portals Advertisement

Terminal Improvements – Phase II Canopy Demolition and Utility Relocation Advertisement (IFB # 2017-01)

  • 7/19/17: Award to Murnane Building Contractors, Inc.

Replace Passenger Boarding Bridge-Gate No. 20 Project (IFB # 2017-02)

  • 10/27/17:   GC Award to Bouley Associates, Inc.
  • 10/27/17:   EC Award to Patricia Electric, Inc.

Terminal Improvement Project – Phase IIIA Landside Utility Improvements at Syracuse International Airport (IFB # 2017-04)

  • 10/19/17:   Prime Contract Award – W.D. Malone Trucking & Excavating, Inc.

Terminal Improvement Project – Phase IIIB Curtain Wall (IFB # 2017-05)

  • 2/02/18:  Award to Ajay Glass and Mirror Company

Terminal Improvement Project-Phase IIIC Advertisement for Vertical Circulation (IFB # 2017-06)

  • Package rebid as (IFB # 2017-06A)

Terminal Improvement Project-Phase  IIID Advertisement for Temporary  Support Space (IFB # 2017-07)

  • 11/20/17 :  Award to Murnane Building Contractors, Inc.

Terminal Improvement Project – Phase III Project Landside Terminal Building Improvements (IFB # 2017-08)

  • 1/22/18:  Award to LeChase Construction

Terminal Improvement Project – Phase IIIC, Vertical Circulation Package Advertisement (IFB # 2017-06A) Re-Bid

  • 12/12/17:  Award to Murnane Building Contractors, Inc.

Terminal Improvement Project – Phase VI Photovoltaic Panel System Advertisement (IFB #2018-01)

Rehabilitation of Deicing Storage Facilities (IFB # 2018-02)

Reconfigure Taxiways C, F, B, E and G (IFB # 2018-03)

RFP #2024-01 SRAA Contract Security

RFP #2024-06 Snow Removal

RFP #2023-22 Terminal Improvement Construction and Management Contractor 

RFP #2023-23 Terminal Improvement Construction Inspection Services

RFP #2023-19 Concessions

 

RFP #2023-20 Switchgear Procurement

RFP 2023-21 HVAC Replacement

RFP #2023-07 Windows and Siding Replacement

RFP #2023-16 100% Design and Construction Phase Services – CONRAC

RFP #2023-06 HVAC Replacement

RFP #2023-08 Hyperspace Vending Area

RFP #2023-09 SRE Building

SRAA RFP 2023-1 Security Service

  • Extension executed with SCIS

RFP #2023-15 Common/Shared Use Passenger Processing System

RFP #2023-05 Business Phone Systems

SRAA RFP 2022-12 Business Phone Systems

NOTICE:   Cellular Carrier Neutral-Host Distributed Antenna System RFP#2021-04:  Per Section 5.1, the Syracuse Regional Airport Authority is cancelling this RFP until further notice.

Common Use Lounge at Syracuse Hancock International Airport RFP #2021-06 ***

Trustee Services for Airport Revenue Bonds for Syracuse Regional Airport Authority RFP #2021-05

Glycol Recycling Quote RFP Reference #2021-09

Underwriting Services for Airport Revenue Bonds for Syracuse Regional Airport Authority RFP#2021-03

Common/Shared Use Passenger Processing System RFP#2021-02

7/27/2020: Parking Management Services RFP #2020-05

RFP #2019-04 Air Service Development Consulting at the Syracuse Hancock International Airport (SYR)

Financial Consulting Services at Syracuse International Airport (RFP #2018-04)

Snow Removal Services (RFP #2019-01

RFP #2019-03 Audit Services at the Syracuse Hancock International Airport